Kinder Morgan

Columbus,Mississippi,USA

Technical Specifications

类型 1500 Series / 11264plus B GA-E
Location Columbus
Mississippi,USA
Application Unloading Pig Iron from Barges to Trucks
Mount High Portal on Rail Lower
Lift Capacity 18.2 UStons / 16,5 Mtons
Reach 86 ft / 26,4 m
Attachment 7.19 yd³ / 5,5 m³ Scrap Grab
4 yd³ / 3 m³ Clamshell Grab Magnet
Power Source 300-hp / 225 kW Electric Motor

Description of the E-Crane

Kinder Morgan needed a state-of-the-art material handler to unload incoming scrap from barges for the new SeverCorr Steel Mill,a state-of-the-art,"next-generation" facility being built in Columbus,MS about eight miles from the Tennessee-Tombigbee waterway.

We looked carefully at several manufacturers' equipment,considering each machine from the standpoint of design,construction,reputation,service life and overall operating efficiency and economy,as well as parts and service backup.E-Crane® wasn't a difficult choice.We've had previous experience operating a similar model E-Crane® at an installation in Venezuela for five years now,and it has performed as expected.

"

Thomas RuffDirector of Operations & EngineeringKinder Morgan

Kinder Morgan transfersscrap and other materials from barges onto trucksfor transport to the nearby SeverCorr facility."Initially we sat down with the E-Crane® people and suppliers of other components for our new facility and brainstormed design and construction possibilities.As far as the E-Crane® machine is concerned,we told them what we wanted to accomplish and they designed a crane specifically to meet our needs.Our new E-Crane® can easily handle present loads with no problem and it gives us extra capacity for growth down the road",said Ruff.